This week was the last of rehearsals to be on book.
our set is 90% complete.
Costumes are being done.
Lines are being memorized.
We have entered the home stretch.
This coming week, rehearsals are Monday-Wednesday, 6:30- 8:30.
THEN, starting on Sunday the 22nd, we've got Tech Week.
*OMINOUS MUSIC!!!!!*
Sunday at 4:30, then Monday-Thursday, with a 6:00 call time.
THEN, the show opens on the 27th.
AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAGH!!!!
Please study your lines and blocking guys!!!!
Hydee-ho!
This is the blog site for the Roundtown Player's children's production.
Read, enjoy, and comment!
Read, enjoy, and comment!
Showing posts with label blocking. Show all posts
Showing posts with label blocking. Show all posts
Thursday, March 12, 2009
Wednesday, February 25, 2009
Week Three: Night Three...
Tonight was great.
We went through the entire second act, and everyone was such a trooper.
Some people were still out due to illness, so hopefully they will get better soon.
We got a really great show in the makings...
We're going to rock the pirating world and Circleville with this production.
Everyone has done such a great job, and James and I are so proud of all the efforts set forth by all.
Set building Saturday will be very constructive, by the looks of things.
A lot of people will be there, which is amazing.
For those who don't really wanna do the whole building thing, we're going to have cleaning projects all over the place in preparation for our using the theatre in its entirety.
I'm totally stoked.
I can't wait!
Monday, February 23, 2009
Week Three: Night one....
Tonight went well, except for the fact that the theatre was FREEEEEEEZING.
All of the poor actors were in their coats, shivering.
We worked on the first half of the second act, and blocked it out.
We still have to work on the gun fighting and attack scenes and whatnot, but it's getting there.
At one point, I was trying to position poor Flynn, and I pulled on his feet in such a way that he tumbled backwards.
It was hilarious and everyone laughed, but I kept stuttering apologies between my laughter.
(Sorry Flynn.)
Brandon continues to amaze me as Long John Silver, being able to pin his poor leg up in such a way that we have abandoned my first idea for changing it to a "wooden leg."
I just pray he can walk by the time the show is over.
lol
As far as I can tell, everyone is really enjoying the chance to be a pirate.
James and I are having a blast.
I sent everyone an email tonight regarding this Saturday, AKA SET BUILDING SATURDAY!!
Instead of dining on pizza and pop, I opted for a pot luck setup.
Someone may still decide to bring a pizza to share with all, which is cool.
I just personally think each family bringing stuff for everyone will make for a better time.
Plus, better food choices lead to a more productive and less lethargic construction crew.
I figured we will all get there between 11:30 and 12, and start working.
Break around 3 for food, then start back up til we have nothing more to do.
At that point, James and I are going to paint the stage once everyone has cleared the stage and left.
Ah....
It's all starting to come together......
A month from now, we will be on day two of tech week....
All of the poor actors were in their coats, shivering.
We worked on the first half of the second act, and blocked it out.
We still have to work on the gun fighting and attack scenes and whatnot, but it's getting there.
At one point, I was trying to position poor Flynn, and I pulled on his feet in such a way that he tumbled backwards.
It was hilarious and everyone laughed, but I kept stuttering apologies between my laughter.
(Sorry Flynn.)
Brandon continues to amaze me as Long John Silver, being able to pin his poor leg up in such a way that we have abandoned my first idea for changing it to a "wooden leg."
I just pray he can walk by the time the show is over.
lol
As far as I can tell, everyone is really enjoying the chance to be a pirate.
James and I are having a blast.
I sent everyone an email tonight regarding this Saturday, AKA SET BUILDING SATURDAY!!
Instead of dining on pizza and pop, I opted for a pot luck setup.
Someone may still decide to bring a pizza to share with all, which is cool.
I just personally think each family bringing stuff for everyone will make for a better time.
Plus, better food choices lead to a more productive and less lethargic construction crew.
I figured we will all get there between 11:30 and 12, and start working.
Break around 3 for food, then start back up til we have nothing more to do.
At that point, James and I are going to paint the stage once everyone has cleared the stage and left.
Ah....
It's all starting to come together......
A month from now, we will be on day two of tech week....
Wednesday, February 11, 2009
Thoughts on last night....
Last night brought new twists and turns along with more members of our scurvy cast.
We added Blind Pew, Black Dog, part of the pirate crew (they are going to be so cool), Squire Trelawney, Redruth, and Hunter.
AND, we got to kill off our first two victims of this production, Bill and Blind Pew.
YAY!
:o)
I found it amusing how many of the kids kept asking me, "Do I get to die?" or "When do I get to kill someone???"
I love it.
Everyone needs to keep in mind that March 4th and 9th, we will be blocking the combat scenes.
This means the brawl between Black Dog and Bill and the fight scenes in Act II.
I'm pretty sure that's it, but James and I will flip through the script and let everyone involved know who will be needed for what.
One thing I hope to instill in all of our cast members is the fact that there are NO unimportant roles in this production.
Just because you don't have a bunch of lines, or we don't see you onstage very often does not mean you are not important.
We sat down and chose each actor for each character very carefully and the end result was a scurvy cast of which we are very proud.
I hope everyone knows that, or quickly learns that.
The saying goes, "There are no small parts, just small actors."
MY saying goes "There are no unimportant part or actors."
Tonight, we are going to touch up 13-29, then run through 1-29.
I gave some individual notes last night so I'm excited to see how those individuals interpret and apply....
After tonight, we won't see these scenes til next Wednesday, when we'll add pages
29-51 to the mix....
We added Blind Pew, Black Dog, part of the pirate crew (they are going to be so cool), Squire Trelawney, Redruth, and Hunter.
AND, we got to kill off our first two victims of this production, Bill and Blind Pew.
YAY!
:o)
I found it amusing how many of the kids kept asking me, "Do I get to die?" or "When do I get to kill someone???"
I love it.
Everyone needs to keep in mind that March 4th and 9th, we will be blocking the combat scenes.
This means the brawl between Black Dog and Bill and the fight scenes in Act II.
I'm pretty sure that's it, but James and I will flip through the script and let everyone involved know who will be needed for what.
One thing I hope to instill in all of our cast members is the fact that there are NO unimportant roles in this production.
Just because you don't have a bunch of lines, or we don't see you onstage very often does not mean you are not important.
We sat down and chose each actor for each character very carefully and the end result was a scurvy cast of which we are very proud.
I hope everyone knows that, or quickly learns that.
The saying goes, "There are no small parts, just small actors."
MY saying goes "There are no unimportant part or actors."
Tonight, we are going to touch up 13-29, then run through 1-29.
I gave some individual notes last night so I'm excited to see how those individuals interpret and apply....
After tonight, we won't see these scenes til next Wednesday, when we'll add pages
29-51 to the mix....
Sunday, January 11, 2009
20 days... and counting... and counting.. and counting...
Yes.
I woke up this morning, looked at my phone and saw that it is indeed the 11th.
Which can only mean we have 20 days til auditions.
Two weeks and six days.
But hey...
Who's counting?
:-/
The scripts still aren't in, which is really frustrating for me.
They were supposed to be in this past week, which only means they will definitely be in THIS week.
Hopefully.
In more positive news, James and I finally met up at the Tuscan Table last night so I could go over all the play details.
(James will be my assistant director for the show and I know he's going to do a great job.)
That was fun.
Because I think I may have overwhelmed him at certain instances.
I spared him the painful details of the blocking, knowing full well that would've taken a good hour to go through.
However, I cover everything else I've worked on, including details about each character.
I was hoping to give him a script for his own BUT that's another story...
I am really hoping that meeting with him last night will help me in the next few weeks...
Or it could just make me even more anxious to get started.
argh.
I'm about 3/4 of the way finished with my emotional blocking.
This has proven to be more tedious than the actual movement blocking, if possible.
On the flip side, it seems to help to put thoughts on paper.
I find I'm writing out notes in the script to offer later or to refer back if need be.
Once the scripts finally come in, I'll be able to take a copy to the library and start making all the neccessary arrangements with them.
Until then, I'll just play the waiting game.....
I woke up this morning, looked at my phone and saw that it is indeed the 11th.
Which can only mean we have 20 days til auditions.
Two weeks and six days.
But hey...
Who's counting?
:-/
The scripts still aren't in, which is really frustrating for me.
They were supposed to be in this past week, which only means they will definitely be in THIS week.
Hopefully.
In more positive news, James and I finally met up at the Tuscan Table last night so I could go over all the play details.
(James will be my assistant director for the show and I know he's going to do a great job.)
That was fun.
Because I think I may have overwhelmed him at certain instances.
I spared him the painful details of the blocking, knowing full well that would've taken a good hour to go through.
However, I cover everything else I've worked on, including details about each character.
I was hoping to give him a script for his own BUT that's another story...
I am really hoping that meeting with him last night will help me in the next few weeks...
Or it could just make me even more anxious to get started.
argh.
I'm about 3/4 of the way finished with my emotional blocking.
This has proven to be more tedious than the actual movement blocking, if possible.
On the flip side, it seems to help to put thoughts on paper.
I find I'm writing out notes in the script to offer later or to refer back if need be.
Once the scripts finally come in, I'll be able to take a copy to the library and start making all the neccessary arrangements with them.
Until then, I'll just play the waiting game.....
Subscribe to:
Posts (Atom)